Separate the layers below a paved surface
A paved patio can have a compacted aggregate base with a thinner bedding layer above it. Those layers serve different purposes and are ordered as different materials. Measure the prepared rectangle that needs base material; if your design extends the base beyond the visible pavers, include that extension in the dimensions. Enter the finished compacted base depth, not the entire excavation depth containing paver thickness.
Convert compacted volume into a loose order
Compacted base = area × base depth; loose aggregate = compacted base × supplier factorA loose delivery can occupy more space than the same aggregate after compaction. The editable ratio represents loose volume divided by finished compacted volume. A factor of 1.2 means ordering 1.2 units of loose material for each unit of compacted base, not losing twenty percent of the delivery. The example factor is arithmetic input rather than a universal material property. Obtain an appropriate value for the selected aggregate, moisture conditions and compaction method.
A five by four metre patio base
A 20 square metre prepared area with a 15 centimetre compacted base contains 3 cubic metres of compacted aggregate. Multiplying by a loose-to-compacted factor of 1.2 produces a 3.6 cubic metre order, approximately 4.7087 cubic yards. A separate 3 centimetre bedding layer contains 0.6 cubic metres of sand. Sand is not multiplied by the aggregate factor because it is a distinct material with its own placement requirements.
Set the design before calculating the takeoff
Required depth depends on loading, subgrade, drainage, climate and the selected paving system. This page does not choose a base depth or a compaction specification. For a sloping formation, use the actual average layer thickness or divide the site into measured sections. The volume output does not become tonnes without the supplier's density: bulk mass varies with aggregate type and moisture. Jointing sand, edging, geotextile and pavers themselves are separate quantities. A bedding depth of zero is allowed when that layer is absent from your design. Check excavation levels and delivery access before ordering, and avoid applying another compaction allowance if the supplier has already quoted the required loose quantity for your finished base.
A reproducible calculation with complete inputs
For a reproducible paver base calculator example, use the metric input system and enter Paved length: 5 m; Paved width: 4 m; Compacted aggregate depth: 15 cm; Bedding sand depth: 3 cm; Loose / compacted aggregate volume: 1.2 factor. These settings describe one specific scenario, not a new default for every job. The result follows the method and allowances already explained above. Keep the entire set of values when comparing it with a hand calculation; omitting a selected material or an allowance can change the result even when the dimensions match. The following rows show the unrounded calculation values alongside the precision used by the interface.
| Result | Calculation value | Displayed value | Unit |
|---|---|---|---|
| Loose aggregate to order | 3.6 | 3.600 | m³ |
| Compacted base volume | 3 | 3.000 | m³ |
| Bedding sand volume | 0.6 | 0.600 | m³ |
| Aggregate cubic yards | 4.70862222953 | 4.709 | yd³ |
How should I prepare these entries?
Paved length: enter the value in m. Paved width: enter the value in m. Compacted aggregate depth: enter the value in cm. Bedding sand depth: enter the value in cm. Loose / compacted aggregate volume: Example only. Obtain the volume factor for your aggregate and compaction method from the supplier. Choose the unit system before transferring your measurements. A depth, length, area and coverage can have different field units even within one system. Read each label individually rather than entering the same unit convention in every box. Optional openings or allowances should describe your actual scenario instead of being silently left at a sample value. The worked inputs above identify exactly which selections produced the table.
How should I compare another measurement?
Change one measurement or option at a time and keep the other inputs fixed. The new result reflects the whole stated formula, including its conversions, allowances and purchase rounding. A quantity that depends on several dimensions does not necessarily respond linearly to every field. Compare intermediate area or volume outputs when present before interpreting the final rounded purchase quantity. This makes a misplaced unit easier to detect than judging the final total alone. Record the selected unit system beside each scenario so that a copied number is not silently reused under different field units.
How do I turn an estimate into an order?
Keep an unrounded physical quantity separate from a rounded count of packages or pieces. Rounding upward to a whole container addresses the purchase unit, whereas a waste or coverage margin addresses an assumption in the formula. They should not be added twice merely because both increase an order. Compare the actual product sizes, coverage and any stated allowances with the assumptions above before buying. A calculated estimate cannot account for an unmeasured feature or a different product simply by displaying more digits.
Frequently asked questions
Is paver thickness included?
No. Enter the compacted aggregate and bedding depths separately. Paver thickness affects excavation but is not part of either material volume.
Why must the aggregate factor be at least one?
The model assumes loose aggregate occupies at least the compacted volume. A factor below one reverses that assumption and is rejected.
Can I get tonnes from this result?
Only with the appropriate bulk density. Ask the supplier to convert the loose order volume to mass for the selected material.
Is bedding sand compacted by the same factor?
No. Its displayed volume is geometric and separate. Use the bedding product's own placement and ordering instructions.
What depth should a driveway use?
This worksheet does not design pavement layers. Obtain a depth appropriate to vehicle loads, ground conditions and the paving system.